How the measured and official figures differ
Measured values (preliminary)
This app pulls PJM's hourly metered load (Data Miner feed hrl_load_metered) each morning
and ranks the five highest June–September days for each zone. These are preliminary values: PJM
revises metered load during settlement, so measured figures can change after they are first published
and can differ from PJM's final numbers.
PJM official 5CP
After each summer, PJM publishes its Summer Peaks and 5CPs report (typically October–November,
with later revisions noted in the report). The official 5CP are the five highest RTO daily peak hours
in June–September, using final, unrestricted load: metered load with load reductions from demand
response and similar programs added back. Because of settlement revisions and the unrestricted
adjustment, official MW values usually differ from measured values, and occasionally a different day
qualifies.
ComEd load during the RTO 5CP hours
PJM's report also lists each zone's load during the five RTO peak hours (page 2, Coincident Peaks,
By Zone). The ComEd figures shown under each season come from that table. This coincident load is
what determines ComEd customers' share of RTO capacity and transmission costs. It is not the same as
ComEd's own highest days, which can fall on other dates and are shown separately below it.
Weather-normalized peaks
PJM adjusts each season's peak loads to normal weather and reports one weather-normalized peak for the
RTO and each zone. PJM uses the weather-normalized zonal peak in setting each zone's capacity obligation
for the delivery year that begins the following June; utilities then allocate that obligation to
individual customers based on their load during the 5CP hours. The weather-normalized peak is a single
adjusted value per zone, not a measured hour, so it has no date or time.
Hours
PJM reports hours as hour ending, Eastern Prevailing Time. This page shows hour beginning, Central
Prevailing Time, so PJM's hour ending 18:00 EPT appears here as 4:00 PM CPT.
PJM reports
Reports © PJM Interconnection, provided here for reference; the
pjm.com links point to PJM's published copies.
CP Hour-of-Day Frequency — Completed Seasons, Measured Data
RTO
Count of measured top-5 days per hour beginning (CPT), all completed Jun–Sep seasons
COMED
Count of measured top-5 days per hour beginning (CPT), all completed Jun–Sep seasons
Weather-normalized peak — RTO: 157,520 MW
ComEd: 19,380 MW
PJM RTO
PJM official 5CP
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2026-07-02 |
4:00 PM |
165,990 |
✓ |
| 2 |
2026-07-01 |
4:00 PM |
161,197 |
✓ |
| 3 |
2026-07-15 |
4:00 PM |
158,487 |
✓ |
| 4 |
2026-07-16 |
4:00 PM |
153,304 |
✓ |
| 5 |
2026-09-01 |
4:00 PM |
152,118 |
✗ |
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2026-07-02 |
4:00 PM |
162,221 |
✓ |
| 2 |
2026-07-01 |
4:00 PM |
161,600 |
✓ |
| 3 |
2026-07-15 |
4:00 PM |
158,676 |
✓ |
| 4 |
2026-07-03 |
4:00 PM |
154,388 |
✗ |
| 5 |
2026-07-16 |
4:00 PM |
153,784 |
✓ |
ComEd load during the RTO 5CP hours
PJM official (report p. 2, Coincident Peaks by Zone)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2026-07-02 |
4:00 PM |
20,137.6 |
| 2 |
2026-07-01 |
4:00 PM |
20,528.7 |
| 3 |
2026-07-15 |
4:00 PM |
20,598.4 |
| 4 |
2026-07-16 |
4:00 PM |
19,113.1 |
| 5 |
2026-09-01 |
4:00 PM |
20,635.8 |
Measured at the same hours (preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2026-07-02 |
4:00 PM |
19,619.0 |
| 2 |
2026-07-01 |
4:00 PM |
20,528.7 |
| 3 |
2026-07-15 |
4:00 PM |
20,598.4 |
| 4 |
2026-07-16 |
4:00 PM |
19,113.1 |
| 5 |
2026-09-01 |
4:00 PM |
20,632.5 |
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2026-09-02 |
4:00 PM |
21,228 |
| 2 |
2026-06-30 |
5:00 PM |
20,677 |
| 3 |
2026-09-01 |
4:00 PM |
20,632 |
| 4 |
2026-07-14 |
5:00 PM |
20,612 |
| 5 |
2026-07-15 |
4:00 PM |
20,598 |
Weather-normalized peak — RTO: 153,870 MW
ComEd: 19,090 MW
PJM RTO
PJM official 5CP
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2025-06-23 |
4:00 PM |
160,649 |
✓ |
| 2 |
2025-06-24 |
4:00 PM |
160,629 |
✓ |
| 3 |
2025-07-29 |
4:00 PM |
156,035 |
✓ |
| 4 |
2025-06-25 |
1:00 PM |
152,904 |
✓ |
| 5 |
2025-07-28 |
4:00 PM |
151,525 |
✓ |
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2025-06-23 |
4:00 PM |
160,157 |
✓ |
| 2 |
2025-06-24 |
4:00 PM |
158,104 |
✓ |
| 3 |
2025-07-29 |
4:00 PM |
153,687 |
✓ |
| 4 |
2025-06-25 |
1:00 PM |
152,656 |
✓ |
| 5 |
2025-07-28 |
4:00 PM |
151,533 |
✓ |
ComEd load during the RTO 5CP hours
PJM official (report p. 2, Coincident Peaks by Zone)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2025-06-23 |
4:00 PM |
20,714.0 |
| 2 |
2025-06-24 |
4:00 PM |
18,822.0 |
| 3 |
2025-07-29 |
4:00 PM |
19,779.4 |
| 4 |
2025-06-25 |
1:00 PM |
16,837.6 |
| 5 |
2025-07-28 |
4:00 PM |
19,538.1 |
Measured at the same hours (preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2025-06-23 |
4:00 PM |
20,713.7 |
| 2 |
2025-06-24 |
4:00 PM |
18,531.6 |
| 3 |
2025-07-29 |
4:00 PM |
19,622.0 |
| 4 |
2025-06-25 |
1:00 PM |
16,784.0 |
| 5 |
2025-07-28 |
4:00 PM |
19,538.1 |
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2025-06-23 |
4:00 PM |
20,714 |
| 2 |
2025-07-23 |
5:00 PM |
20,375 |
| 3 |
2025-06-26 |
4:00 PM |
20,152 |
| 4 |
2025-07-24 |
1:00 PM |
19,914 |
| 5 |
2025-07-29 |
3:00 PM |
19,749 |
Weather-normalized peak — RTO: 152,804 MW
ComEd: 19,040 MW
PJM RTO
PJM official 5CP
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2024-07-16 |
4:00 PM |
152,307 |
✓ |
| 2 |
2024-07-15 |
4:00 PM |
151,103 |
✓ |
| 3 |
2024-08-01 |
4:00 PM |
148,240 |
✓ |
| 4 |
2024-06-21 |
4:00 PM |
147,271 |
✓ |
| 5 |
2024-08-28 |
4:00 PM |
147,248 |
✓ |
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2024-07-16 |
4:00 PM |
152,552 |
✓ |
| 2 |
2024-07-15 |
4:00 PM |
151,586 |
✓ |
| 3 |
2024-08-01 |
4:00 PM |
148,651 |
✓ |
| 4 |
2024-08-28 |
4:00 PM |
147,591 |
✓ |
| 5 |
2024-06-21 |
4:00 PM |
147,521 |
✓ |
ComEd load during the RTO 5CP hours
PJM official (report p. 2, Coincident Peaks by Zone)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2024-07-16 |
4:00 PM |
16,972.5 |
| 2 |
2024-07-15 |
4:00 PM |
19,014.1 |
| 3 |
2024-08-01 |
4:00 PM |
17,556.2 |
| 4 |
2024-06-21 |
4:00 PM |
18,568.7 |
| 5 |
2024-08-28 |
4:00 PM |
16,726.8 |
Measured at the same hours (preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2024-07-16 |
4:00 PM |
16,972.5 |
| 2 |
2024-07-15 |
4:00 PM |
19,014.1 |
| 3 |
2024-08-01 |
4:00 PM |
17,556.2 |
| 4 |
2024-06-21 |
4:00 PM |
18,568.2 |
| 5 |
2024-08-28 |
4:00 PM |
16,726.6 |
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2024-08-27 |
4:00 PM |
21,560 |
| 2 |
2024-08-26 |
4:00 PM |
20,851 |
| 3 |
2024-06-17 |
5:00 PM |
19,874 |
| 4 |
2024-06-18 |
4:00 PM |
19,495 |
| 5 |
2024-06-19 |
4:00 PM |
19,486 |
Weather-normalized peak — RTO: 148,659 MW
ComEd: 18,720 MW
PJM RTO
PJM official 5CP
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2023-07-27 |
4:00 PM |
146,843 |
✓ |
| 2 |
2023-09-05 |
3:00 PM |
146,167 |
✓ |
| 3 |
2023-07-28 |
4:00 PM |
144,452 |
✓ |
| 4 |
2023-09-06 |
3:00 PM |
141,355 |
✓ |
| 5 |
2023-07-05 |
4:00 PM |
137,806 |
✗ |
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2023-07-27 |
4:00 PM |
147,178 |
✓ |
| 2 |
2023-09-05 |
3:00 PM |
146,442 |
✓ |
| 3 |
2023-07-28 |
4:00 PM |
144,789 |
✓ |
| 4 |
2023-09-06 |
3:00 PM |
141,482 |
✓ |
| 5 |
2023-09-04 |
4:00 PM |
138,722 |
✗ |
ComEd load during the RTO 5CP hours
PJM official (report p. 2, Coincident Peaks by Zone)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2023-07-27 |
4:00 PM |
19,360.0 |
| 2 |
2023-09-05 |
3:00 PM |
17,718.5 |
| 3 |
2023-07-28 |
4:00 PM |
19,294.1 |
| 4 |
2023-09-06 |
3:00 PM |
15,097.1 |
| 5 |
2023-07-05 |
4:00 PM |
17,149.0 |
Measured at the same hours (preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2023-07-27 |
4:00 PM |
19,357.9 |
| 2 |
2023-09-05 |
3:00 PM |
17,718.5 |
| 3 |
2023-07-28 |
4:00 PM |
19,294.1 |
| 4 |
2023-09-06 |
3:00 PM |
15,097.0 |
| 5 |
2023-07-05 |
4:00 PM |
17,149.0 |
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2023-08-24 |
4:00 PM |
22,467 |
| 2 |
2023-08-23 |
4:00 PM |
21,929 |
| 3 |
2023-07-27 |
4:00 PM |
19,358 |
| 4 |
2023-07-28 |
4:00 PM |
19,294 |
| 5 |
2023-09-05 |
1:00 PM |
18,322 |
Weather-normalized peak — RTO: 148,894 MW
ComEd: 20,080 MW
PJM RTO
PJM official 5CP
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2022-07-20 |
4:00 PM |
147,334 |
✓ |
| 2 |
2022-07-21 |
3:00 PM |
145,144 |
✓ |
| 3 |
2022-07-22 |
4:00 PM |
144,246 |
✓ |
| 4 |
2022-08-08 |
2:00 PM |
143,101 |
✓ |
| 5 |
2022-08-03 |
4:00 PM |
142,112 |
✓ |
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2022-07-20 |
4:00 PM |
147,771 |
✓ |
| 2 |
2022-07-21 |
3:00 PM |
145,477 |
✓ |
| 3 |
2022-07-22 |
4:00 PM |
144,634 |
✓ |
| 4 |
2022-08-08 |
2:00 PM |
143,389 |
✓ |
| 5 |
2022-08-03 |
4:00 PM |
142,398 |
✓ |
ComEd load during the RTO 5CP hours
PJM official (report p. 2, Coincident Peaks by Zone)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2022-07-20 |
4:00 PM |
17,807.7 |
| 2 |
2022-07-21 |
3:00 PM |
19,092.2 |
| 3 |
2022-07-22 |
4:00 PM |
17,964.0 |
| 4 |
2022-08-08 |
2:00 PM |
14,952.5 |
| 5 |
2022-08-03 |
4:00 PM |
17,043.4 |
Measured at the same hours (preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2022-07-20 |
4:00 PM |
17,807.7 |
| 2 |
2022-07-21 |
3:00 PM |
19,092.2 |
| 3 |
2022-07-22 |
4:00 PM |
17,964.0 |
| 4 |
2022-08-08 |
2:00 PM |
14,952.5 |
| 5 |
2022-08-03 |
4:00 PM |
17,043.4 |
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2022-06-21 |
5:00 PM |
21,262 |
| 2 |
2022-06-15 |
4:00 PM |
20,731 |
| 3 |
2022-06-14 |
4:00 PM |
20,606 |
| 4 |
2022-07-05 |
3:00 PM |
19,685 |
| 5 |
2022-06-16 |
4:00 PM |
19,210 |
PJM RTO
PJM official 5CP
No PJM report loaded for this season.
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2021-08-24 |
4:00 PM |
148,751 |
|
| 2 |
2021-08-12 |
3:00 PM |
148,209 |
|
| 3 |
2021-06-29 |
3:00 PM |
146,845 |
|
| 4 |
2021-07-06 |
3:00 PM |
146,037 |
|
| 5 |
2021-08-26 |
2:00 PM |
145,831 |
|
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2021-08-24 |
3:00 PM |
21,166 |
| 2 |
2021-08-10 |
4:00 PM |
20,455 |
| 3 |
2021-08-25 |
3:00 PM |
19,904 |
| 4 |
2021-08-27 |
4:00 PM |
19,862 |
| 5 |
2021-07-06 |
3:00 PM |
19,454 |
PJM RTO
PJM official 5CP
No PJM report loaded for this season.
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2020-07-20 |
3:00 PM |
144,565 |
|
| 2 |
2020-07-27 |
3:00 PM |
143,756 |
|
| 3 |
2020-07-09 |
4:00 PM |
143,473 |
|
| 4 |
2020-07-06 |
1:00 PM |
141,453 |
|
| 5 |
2020-07-29 |
4:00 PM |
141,053 |
|
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2020-08-27 |
4:00 PM |
20,220 |
| 2 |
2020-08-28 |
3:00 PM |
20,181 |
| 3 |
2020-07-09 |
4:00 PM |
20,136 |
| 4 |
2020-08-24 |
3:00 PM |
20,108 |
| 5 |
2020-07-07 |
3:00 PM |
20,055 |
PJM RTO
PJM official 5CP
No PJM report loaded for this season.
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2019-07-20 |
3:00 PM |
149,746 |
|
| 2 |
2019-07-17 |
3:00 PM |
143,161 |
|
| 3 |
2019-07-10 |
4:00 PM |
141,842 |
|
| 4 |
2019-08-19 |
3:00 PM |
141,381 |
|
| 5 |
2019-07-21 |
4:00 PM |
139,979 |
|
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2019-07-10 |
3:00 PM |
20,635 |
| 2 |
2019-07-20 |
2:00 PM |
20,204 |
| 3 |
2019-07-02 |
4:00 PM |
19,820 |
| 4 |
2019-07-15 |
4:00 PM |
19,716 |
| 5 |
2019-07-17 |
2:00 PM |
19,341 |
PJM RTO
PJM official 5CP
No PJM report loaded for this season.
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2018-08-28 |
3:00 PM |
150,670 |
|
| 2 |
2018-09-04 |
3:00 PM |
148,583 |
|
| 3 |
2018-06-18 |
3:00 PM |
148,462 |
|
| 4 |
2018-09-05 |
3:00 PM |
147,908 |
|
| 5 |
2018-08-27 |
3:00 PM |
145,805 |
|
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2018-06-18 |
5:00 PM |
21,349 |
| 2 |
2018-06-29 |
6:00 PM |
20,996 |
| 3 |
2018-08-27 |
5:00 PM |
20,374 |
| 4 |
2018-06-30 |
6:00 PM |
19,954 |
| 5 |
2018-09-04 |
6:00 PM |
19,840 |
PJM RTO
PJM official 5CP
No PJM report loaded for this season.
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2017-07-19 |
4:00 PM |
145,637 |
|
| 2 |
2017-07-20 |
3:00 PM |
145,325 |
|
| 3 |
2017-07-21 |
3:00 PM |
141,794 |
|
| 4 |
2017-06-12 |
4:00 PM |
140,955 |
|
| 5 |
2017-06-13 |
3:00 PM |
138,617 |
|
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2017-06-12 |
6:00 PM |
20,351 |
| 2 |
2017-09-22 |
5:00 PM |
20,030 |
| 3 |
2017-09-21 |
5:00 PM |
19,484 |
| 4 |
2017-07-06 |
6:00 PM |
19,418 |
| 5 |
2017-06-14 |
3:00 PM |
18,973 |
PJM RTO
PJM official 5CP
No PJM report loaded for this season.
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2016-08-11 |
2:00 PM |
152,177 |
|
| 2 |
2016-07-25 |
2:00 PM |
150,826 |
|
| 3 |
2016-08-12 |
1:00 PM |
147,061 |
|
| 4 |
2016-07-27 |
3:00 PM |
144,731 |
|
| 5 |
2016-08-10 |
3:00 PM |
143,546 |
|
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2016-08-11 |
4:00 PM |
21,175 |
| 2 |
2016-09-06 |
6:00 PM |
20,949 |
| 3 |
2016-08-04 |
6:00 PM |
20,501 |
| 4 |
2016-07-21 |
7:00 PM |
20,296 |
| 5 |
2016-07-11 |
6:00 PM |
20,268 |
PJM RTO
PJM official 5CP
No PJM report loaded for this season.
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2015-07-28 |
3:00 PM |
143,633 |
|
| 2 |
2015-07-20 |
3:00 PM |
143,065 |
|
| 3 |
2015-07-29 |
3:00 PM |
142,225 |
|
| 4 |
2015-09-03 |
3:00 PM |
141,210 |
|
| 5 |
2015-08-17 |
1:00 PM |
139,650 |
|
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2015-09-03 |
6:00 PM |
20,162 |
| 2 |
2015-07-28 |
5:00 PM |
19,765 |
| 3 |
2015-09-02 |
4:00 PM |
19,717 |
| 4 |
2015-07-17 |
5:00 PM |
19,525 |
| 5 |
2015-09-01 |
6:00 PM |
19,424 |
PJM RTO
PJM official 5CP
No PJM report loaded for this season.
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2014-06-17 |
4:00 PM |
141,678 |
|
| 2 |
2014-06-18 |
3:00 PM |
139,517 |
|
| 3 |
2014-07-01 |
4:00 PM |
139,380 |
|
| 4 |
2014-07-22 |
4:00 PM |
138,188 |
|
| 5 |
2014-09-05 |
2:00 PM |
138,157 |
|
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2014-07-22 |
5:00 PM |
19,721 |
| 2 |
2014-06-17 |
6:00 PM |
19,412 |
| 3 |
2014-09-05 |
3:00 PM |
19,016 |
| 4 |
2014-08-25 |
1:00 PM |
18,893 |
| 5 |
2014-06-30 |
5:00 PM |
18,874 |
PJM RTO
PJM official 5CP
No PJM report loaded for this season.
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2013-07-18 |
3:00 PM |
157,509 |
|
| 2 |
2013-07-19 |
1:00 PM |
156,077 |
|
| 3 |
2013-07-17 |
3:00 PM |
154,044 |
|
| 4 |
2013-07-16 |
3:00 PM |
151,421 |
|
| 5 |
2013-07-15 |
4:00 PM |
150,315 |
|
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2013-07-18 |
5:00 PM |
22,269 |
| 2 |
2013-07-19 |
5:00 PM |
22,038 |
| 3 |
2013-08-27 |
6:00 PM |
21,960 |
| 4 |
2013-07-17 |
6:00 PM |
21,801 |
| 5 |
2013-09-10 |
5:00 PM |
21,572 |
PJM RTO
PJM official 5CP
No PJM report loaded for this season.
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2012-07-17 |
3:00 PM |
154,339 |
|
| 2 |
2012-07-18 |
12:00 PM |
152,758 |
|
| 3 |
2012-07-06 |
3:00 PM |
151,966 |
|
| 4 |
2012-07-16 |
3:00 PM |
148,672 |
|
| 5 |
2012-07-05 |
2:00 PM |
148,087 |
|
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2012-07-06 |
5:00 PM |
23,601 |
| 2 |
2012-07-17 |
5:00 PM |
23,265 |
| 3 |
2012-07-05 |
4:00 PM |
23,131 |
| 4 |
2012-06-28 |
6:00 PM |
22,837 |
| 5 |
2012-07-25 |
6:00 PM |
22,502 |
PJM RTO
PJM official 5CP
No PJM report loaded for this season.
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2011-07-21 |
3:00 PM |
158,043 |
|
| 2 |
2011-07-22 |
1:00 PM |
151,366 |
|
| 3 |
2011-07-20 |
3:00 PM |
150,060 |
|
| 4 |
2011-07-19 |
3:00 PM |
145,247 |
|
| 5 |
2011-06-08 |
3:00 PM |
144,325 |
|
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2011-07-20 |
6:00 PM |
23,753 |
| 2 |
2011-07-21 |
5:00 PM |
23,670 |
| 3 |
2011-08-02 |
6:00 PM |
22,576 |
| 4 |
2011-07-19 |
5:00 PM |
22,463 |
| 5 |
2011-09-01 |
6:00 PM |
21,900 |
PJM RTO
PJM official 5CP
No PJM report loaded for this season.
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2010-07-06 |
3:00 PM |
136,465 |
|
| 2 |
2010-07-07 |
3:00 PM |
135,416 |
|
| 3 |
2010-07-23 |
4:00 PM |
134,234 |
|
| 4 |
2010-08-10 |
3:00 PM |
131,946 |
|
| 5 |
2010-08-11 |
3:00 PM |
131,356 |
|
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2010-08-12 |
5:00 PM |
21,914 |
| 2 |
2010-07-23 |
6:00 PM |
21,666 |
| 3 |
2010-07-15 |
5:00 PM |
21,410 |
| 4 |
2010-08-13 |
5:00 PM |
21,300 |
| 5 |
2010-08-11 |
6:00 PM |
21,214 |
PJM RTO
PJM official 5CP
No PJM report loaded for this season.
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2009-08-10 |
3:00 PM |
126,805 |
|
| 2 |
2009-08-18 |
2:00 PM |
122,336 |
|
| 3 |
2009-08-17 |
3:00 PM |
121,913 |
|
| 4 |
2009-08-11 |
3:00 PM |
120,604 |
|
| 5 |
2009-08-20 |
3:00 PM |
120,095 |
|
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2009-06-25 |
2:00 PM |
21,218 |
| 2 |
2009-06-23 |
4:00 PM |
20,921 |
| 3 |
2009-06-24 |
12:00 PM |
20,758 |
| 4 |
2009-06-22 |
4:00 PM |
19,097 |
| 5 |
2009-06-26 |
3:00 PM |
18,808 |
PJM RTO
PJM official 5CP
No PJM report loaded for this season.
Measured top 5 (preliminary metered)
| # | Date | Hour beg. (CPT) | MW | |
| 1 |
2008-06-09 |
3:00 PM |
130,100 |
|
| 2 |
2008-07-17 |
3:00 PM |
129,481 |
|
| 3 |
2008-07-18 |
3:00 PM |
128,912 |
|
| 4 |
2008-07-21 |
3:00 PM |
128,624 |
|
| 5 |
2008-06-10 |
3:00 PM |
127,888 |
|
ComEd's own top 5 days (measured, preliminary metered)
| # | Date | Hour beg. (CPT) | MW |
| 1 |
2008-07-16 |
3:00 PM |
20,948 |
| 2 |
2008-07-17 |
3:00 PM |
20,780 |
| 3 |
2008-09-02 |
3:00 PM |
20,564 |
| 4 |
2008-07-30 |
4:00 PM |
20,226 |
| 5 |
2008-08-01 |
3:00 PM |
20,152 |